ADU Builders in Old Town, ME
ADU builders in Old Town, ME work in a city where 36.4 percent of the housing predates 1940 and the median house went up in 1963. Before any plan is drawn, we find out whether your lot is on Marsh Island's city sewer and water or on a septic system and a well.
- (207) 421-9729
- 22 State St, 1st Floor, Ste 1, Bangor
- [email protected]

- ADUs are all we build
- Free estimate requests
- 22 towns, Bangor to Hudson
This page covers ADU construction in Old Town, Maine: in-law apartments in the city's older houses, apartments over back garages on Marsh Island, and cottages on the rural lots off the island.
ADU Builders Bangor confirms the city's current ADU rule with its code office, since the zoning text online predates the state law, and settles city sewer or septic before any plan is drawn.
The figure to keep: an Old Town garage ADU with a kitchenette averages $82,000 to $125,000, and a detached ADU with a full kitchen $144,000 to $212,000+. Each is an average across many quotes rather than a price for your lot.
Why Does Marsh Island Matter for an Old Town ADU?
Marsh Island matters for an Old Town ADU because the city's 2016 plan says public sewer and water stop at its shores, so an island unit ties into city lines while one elsewhere needs its own septic system and well. That line moves an Old Town budget more than the unit's size does.
- City sewer and Old Town Water District mains on Marsh Island
- Septic systems and private wells off the island
- 13.7 percent of the city's housing already in two-unit buildings

Get your free estimate request sent in 60 seconds!
Prepare your request below, then send it from your email app. Or call (207) 421-9729.
Where Else Around Old Town Do We Build?
See all 22 towns we serveWhich ADU Fits Which Old Town Lot?
Old Town lots split along one line, on Marsh Island or off it, and that line steers which of our three units fits.

Detached Cottages Off Marsh Island
Detached ADUs make the most sense on the larger lots off Marsh Island, where the city's plan says no public sewer or water runs. There, a cottage brings its own septic design, sized under state guidance for two bedrooms and 180 gallons of flow per day.
A licensed site evaluator lays out that system on the state's HHE-200 form, which now lists ADUs as their own category. We settle that design before the cottage gets a footprint, since the field often decides where it can stand.

Apartments Over Old Town Back Garages
Garage ADUs suit the Marsh Island lots where an older house keeps a garage at the back of a narrow yard and city sewer runs close by. A lot inside a mapped flood hazard area near the Penobscot or the Stillwater also needs the city's flood hazard development permit before work starts.
An old garage gets a structure check before anyone promises it a second floor, and a weak one is usually better replaced. A replacement garage built around the apartment from its first wall carries that load by design.

In-Law Apartments in Old Town's Older Houses
In-law apartments suit a city where two-unit buildings already hold 13.7 percent of the housing, so two households under one roof is a familiar Old Town shape. A back ell, an upper floor or part of a large ground floor can become a separate home.
Old Town has over 4,000 residents, and Maine law requires a municipality that size to enforce the state building code. We build the shared wall or floor to that code's fire separation and open an older house carefully to see what the new work ties into.
What ADU Building Services Do We Offer in Old Town?
Three of our services carry most Old Town units.
- Apartments carved from older city houses
- City sewer tie-ins on Marsh Island
- Septic designs and wells off the island
The Old Town code enforcement office issues the building permit, the plumbing permit and the flood hazard permit, and the city charges nothing for the certificate of occupancy a new unit needs before anyone lives in it. We file whichever permits the work calls for, and each one is the city's call.
How to Plan an Old Town ADU Around the Sewer Line

Island or not, then the rule.
We walk the house and yard with you, confirm whether city sewer and water reach the lot, and read what Old Town's code and the state law allow on it.

A price and a contract, in writing.
The unit, its utility work and its foundation are priced on paper. Past $3,000 the contract carries both signatures, a third of the price is the most we take before work starts, and a surprise behind an old wall gets a written change order first.

Permits filed, the unit built, keys after a walk.
We file the permits, build through the city's inspections, and hand over the keys after a final walkthrough together.
Who Are the Right ADU Builders in Old Town, ME?
The right ADU builders in Old Town, ME confirm the city's rule and the sewer question before they draw. The zoning text we could read predates Maine's ADU law, and the online code lists newer laws we could not open, so the code office gets the first call.
Until it answers, Maine's ADU law sets the floor: the city must allow an ADU on any single-family lot in a residential area and may demand no parking beyond the house's. Old Town's own 2016 plan went further, naming as a high priority an ordinance that lets every dwelling in the Marsh Island growth area add an accessory apartment where the site allows.
Maine's home construction contract statute protects the money side: home construction past $3,000 belongs in a written agreement both parties sign. Under it, no more than a third of the total can be asked up front.

Where and When Does Old Town Review an ADU?
Where in Old Town is an ADU easiest to serve?
An ADU in Old Town is easiest to serve on Marsh Island, where the city's wastewater system and the water district's mains already run, some sewers dating to the 1890s. Off the island, water and wastewater start from nothing.
When does Old Town double a permit fee?
Old Town doubles a building permit fee when work begins ahead of the permit, under the fee schedule the city adopted in July 2006. We apply first and dig second.
When can a new Old Town unit be lived in?
A new Old Town unit can be lived in once the city issues its certificate of occupancy, which costs nothing, and once the owner has shown written proof of adequate water and sewer as state law requires.

Something else to ask? Call (207) 421-9729.
How Much Will an ADU Cost in Old Town?
An ADU in Old Town averages $82,000 to $125,000 as an apartment tied to a garage, kitchenette included. A cottage of its own with a full kitchen runs $144,000 to $212,000+, and both are averages from many quotes that check a budget, not a bid for your lot.
| Kind of ADU | Typical size | Average range |
|---|---|---|
| Garage ADU with a kitchenette | 400 to 600 square feet | $82,000 to $125,000 |
| Detached ADU with a full kitchen | 600 to 900 square feet | $144,000 to $212,000+ |
| In-law apartment on or in the house | depends on the house | priced from a visit |
Old Town averages gathered across many quotes, not your price. A unit standing apart costs more than one joined to the house, a full kitchen more than a kitchenette, and a fresh septic system more than a sewer tie-in. Land is never in these figures, and a city demand the plan missed gets its own written line.
What raises a detached unit's cost in Old Town?
A detached unit's cost in Old Town rises most off Marsh Island, where a septic design and a well replace a short city hookup. A deep foundation and a full kitchen add to it.
Is an old Old Town garage worth building over?
An old Old Town garage is worth building over only when the structure check shows its slab and walls can carry a floor. One that fails is usually cheaper to replace with a garage framed for the apartment.
Why is an Old Town in-law apartment priced only from a visit?
An Old Town in-law apartment is priced only from a visit because an older house decides the work: the fire separation, the age of the pipes and wires it joins, and a basement's escape-sized windows. We see the house first, then write the number.
What Do We Look at First on Your Old Town Lot?
On your Old Town lot we look first at the sewer or septic, then the city's current rule, then the house. Send a free estimate request, and a written figure follows the visit.